Thursday, March 5, 2026
  • About
  • Contact
  • Privacy Policy
Ecobuild.club
  • Home
  • Sustainability
  • Insulation
  • Energy Efficiency
  • Eco Build
  • Green Energy
  • Natural Global Resources
  • Videos
No Result
View All Result
Ecobuild.club
Home Energy Efficiency

FERC issues final EIS for 393.3-MW Swan Lake North Pumped Storage Project

16th March 2019
in Energy Efficiency
0
FERC issues final EIS for 393.3-MW Swan Lake North Pumped Storage Project
0
SHARES
96
VIEWS
Share on FacebookShare on Twitter

Federal Energy Regulatory Commission staff have issued a final environmental impact statement (EIS) for the licensing of Swan Lake North Hydro LLC’s proposed 393.3-MW Swan Lake North Pumped Storage Project.

The primary issues associated with licensing the Swan Lake North project – to be located in Klamath County, Oregon — are effects of construction and operation on soils, water quality, terrestrial resources, recreation and land use, and, most significantly, cultural resources of importance to the Klamath Tribes.

In the final EIS, FERC staff recommended the staff alternative, which consists of measures included in Swan Lake North Hydro’s proposal, as well as many of the recommendations made by county, state and federal agencies, and some additional measures developed by the staff.

Swan Lake North Hydro filed an application on Oct. 28, 2015, for construction and operation of the closed-loop Swan Lake North Project. Water to initially fill the reservoirs and to replace water lost to evaporation and seepage would come from groundwater supplied by the local groundwater agricultural pumping system and delivered to the lower reservoir via an existing underground agricultural irrigation network.

The proposed project would consist of a new upper and lower reservoir, a high-pressure steel penstock between the upper reservoir and the powerhouse, a powerhouse with generating/pumping facilities, three low-pressure steel penstocks from the powerhouse to the lower reservoir, a transmission line and substation, access roads to the lower and upper reservoirs, and accompanying facilities.

The project would occupy 730 acres of federal land administered by the U.S. Bureau of Land Management and the U.S. Department of Interior’s Bureau of Reclamation, and 1,310 acres of state, county and private lands.

Click here to view the complete EISayefvsxrzqvzvsbetqdsdxvaad.
[Native Advertisement]

Source

Related posts

Denver vehicle-to-building pilot yields net benefits

Denver vehicle-to-building pilot yields net benefits

10th December 2021
India’s wind market is ready for its comeback

Building out renewables in India could cost $26.5b through 2030, report says

10th December 2021
Previous Post

Insulating an External Solid Wall - TheGreenAge

Next Post

Toyota RAV4 Hybrid 2019: Modo Sport en autovía | ECO en carretera | EV en ciudad | Consumos

Next Post
Toyota RAV4 Hybrid 2019: Modo Sport en autovía | ECO en carretera | EV en ciudad | Consumos

Toyota RAV4 Hybrid 2019: Modo Sport en autovía | ECO en carretera | EV en ciudad | Consumos

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED NEWS

Indonesian Communities Protect Millions of Hectares of Rainforest

Indonesian Communities Protect Millions of Hectares of Rainforest

2 days ago
China’s Supply Chain Businesses Secure Groundbreaking Renewable Power Deal

China’s Supply Chain Businesses Secure Groundbreaking Renewable Power Deal

2 days ago
US Cities and Towns Take Innovative Approach to Renewable Energy

US Cities and Towns Take Innovative Approach to Renewable Energy

2 days ago
Beijing Expands Green Transportation, Cuts Emissions Through Digital Transit Platform

Beijing Expands Green Transportation, Cuts Emissions Through Digital Transit Platform

2 days ago

POPULAR NEWS

  • Top Findings from the IPCC Climate Change Report 2023

    0 shares
    Share 0 Tweet 0
  • How Companies Can Address Land-Use Change Emissions

    0 shares
    Share 0 Tweet 0
  • Why a Just Transition Is Crucial for Colombia’s Climate Future

    0 shares
    Share 0 Tweet 0
  • Coronavirus poses latest threat to battered health system in DR Congo

    0 shares
    Share 0 Tweet 0
  • World AIDS Day: UN urges leaders to ‘take the rights path to end AIDS’ by 2030

    0 shares
    Share 0 Tweet 0
Ecobuild.club

ecobuild.club is an online news portal which aims to provide knowledge about Sustainability, Insulation, Energy Efficiency, Eco Build, Green Energy & Natural Global Resources.

Follow us on social media:

Recent News

  • CSW70 (2026) | UN Women – Headquarters
  • 8 March | International Women’s Day
  • Ethiopia’s Federal Government Finances Large-Scale Nature Restoration

Category

  • Eco Build
  • Energy Efficiency
  • Green Energy
  • Insulation
  • Natural Global Resources
  • Sustainability
  • Videos

Subscribe to get more!

  • About
  • Contact
  • Privacy Policy

© 2018 EcoBuild.club - All about Eco Friendly Environment !

No Result
View All Result
  • Home
  • Sustainability
  • Insulation
  • Energy Efficiency
  • Eco Build
  • Green Energy
  • Natural Global Resources
  • Videos

© 2018 EcoBuild.club - All about Eco Friendly Environment !