Saturday, July 19, 2025
  • About
  • Contact
  • Privacy Policy
Ecobuild.club
  • Home
  • Sustainability
  • Insulation
  • Energy Efficiency
  • Eco Build
  • Green Energy
  • Natural Global Resources
  • Videos
No Result
View All Result
Ecobuild.club
Home Energy Efficiency

Alaska’s Glacier Bay National Park to use hydropower for operations

11th June 2021
in Energy Efficiency
0
Alaska’s Glacier Bay National Park to use hydropower for operations
0
SHARES
14
VIEWS
Share on FacebookShare on Twitter

Related posts

Denver vehicle-to-building pilot yields net benefits

Denver vehicle-to-building pilot yields net benefits

10th December 2021
India’s wind market is ready for its comeback

Building out renewables in India could cost $26.5b through 2030, report says

10th December 2021

Glacier Bay

Work is under way at Glacier Bay National Park and Preserve in Alaska to tie into a hydropower network to provide renewable power to the headquarters complex.

More than 20 years in the making, this project – known as the intertie – will connect the park’s existing power system with the 800-kW Falls Creek Hydroelectric Project, which powers much of the southeast Alaska community of Gustavus. This effort is a public-private renewable energy partnership between the National Park Service and Alaska Power and Telephone. Sharing an interconnected grid will provide power reliability and redundancy for both the park and Gustavus.

The park is powered by diesel-fired generators located in a central powerhouse in Bartlett Cove. Access to clean, renewable power will eliminate the need to ship more than 38,000 gallons of diesel fuel annually through the sensitive marine environment of southeast Alaska. The project will also reduce the park’s greenhouse gas emissions by an estimated 600 tons of carbon dioxide per year. Carbon dioxide emissions generated by human activity are a primary driver of global climate change, which is significantly impacting park resources, including its glaciers.

The intertie project requires laying buried electrical line and fiber optic cable from the park’s “Depot” and recycling area about 8.5 miles to the Falls Creek plant following a route along existing roadways. Trenching outside the park will take place within the State of Alaska’s Department of Transportation right-of-way. The trench will typically be 18 to 24 inches wide and 4 feet deep and situated 6 to 10 feet from the road pavement edge.

This renewable energy partnership between the park and AP&T has its roots in a 1998 land exchange that made way for a run-of-river hydro system installed at Falls Creek, a stream flowing out of the Chilkat Range. Operating since 2009, the Falls Creek Hydroelectric Project eliminates the need to import an estimated 300,000 gallons of diesel fuel annually to Gustavus.

A 2013 feasibility study conducted by the NPS — followed by additional studies and stakeholder engagement, including with city officials and Gustavus community members — determined that integrating existing park electrical facilities with the community electrical grid would be positive for the park and community. In addition to the environmental benefits, the project will reduce infrastructure costs and is expected to result in lower power rates for the community.

The intertie will be owned, operated and maintained under a contract between the park and AP&T, which will also maintain the park’s generators to work along with existing AP&T generators in Gustavus for use as backup in case of drought or emergency. The fiber optic cable laid with the power cable will allow AP&T to monitor and control connections with the park. The construction contract and related maintenance agreement are being managed by the Denver Service Center, the central planning, design and construction management office for the NPS.

The intertie connection is expected to be complete by Dec. 31, 2021.

Source

Previous Post

Nine in 10 African nations set to miss urgent COVID vaccination goal  |

Next Post

Charging forward with the EV revolution in the US

Next Post
Charging forward with the EV revolution in the US

Charging forward with the EV revolution in the US

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED NEWS

The Sustainable Development Goals have improved millions of lives over the past decade, but progress remains insufficient, UN report finds

5 days ago

POPULAR NEWS

  • Stamping out corruption can give SDGs $3 trillion boost

    Stamping out corruption can give SDGs $3 trillion boost

    0 shares
    Share 0 Tweet 0
  • Zimbabwe faces worsening food crisis due to El Niño droughts

    0 shares
    Share 0 Tweet 0
  • US funding cuts threaten global health response, WHO chief warns

    0 shares
    Share 0 Tweet 0
  • Assembly President launches new initiative to purge plastics and purify oceans

    0 shares
    Share 0 Tweet 0
  • At UN, youth activists press for bold action on climate emergency, vow to hold leaders accountable at the ballot box

    0 shares
    Share 0 Tweet 0
Ecobuild.club

ecobuild.club is an online news portal which aims to provide knowledge about Sustainability, Insulation, Energy Efficiency, Eco Build, Green Energy & Natural Global Resources.

Follow us on social media:

Recent News

  • The Sustainable Development Goals have improved millions of lives over the past decade, but progress remains insufficient, UN report finds
  • Media Advisory | UN Forum to boost momentum towards 2030
  • How Advanced Transmission Technologies Can Modernize the US Power Grid

Category

  • Eco Build
  • Energy Efficiency
  • Green Energy
  • Insulation
  • Natural Global Resources
  • Sustainability
  • Videos

Subscribe to get more!

  • About
  • Contact
  • Privacy Policy

© 2018 EcoBuild.club - All about Eco Friendly Environment !

No Result
View All Result
  • Home
  • Sustainability
  • Insulation
  • Energy Efficiency
  • Eco Build
  • Green Energy
  • Natural Global Resources
  • Videos

© 2018 EcoBuild.club - All about Eco Friendly Environment !