Wednesday, October 8, 2025
  • About
  • Contact
  • Privacy Policy
Ecobuild.club
  • Home
  • Sustainability
  • Insulation
  • Energy Efficiency
  • Eco Build
  • Green Energy
  • Natural Global Resources
  • Videos
No Result
View All Result
Ecobuild.club
Home Energy Efficiency

FERC finalizes expedited licensing process for hydropower projects

23rd April 2019
in Energy Efficiency
0
FERC finalizes expedited licensing process for hydropower projects
0
SHARES
15
VIEWS
Share on FacebookShare on Twitter

The U.S. Federal Energy Regulatory Commission (FERC) has issued a final rule establishing an expedited licensing process for original hydropower licenses for certain qualifying facilities at existing non-powered dams and for closed-loop pumped storage projects.

The rule is part of the commission’s implementation of the America’s Water Infrastructure Act and seeks to ensure a final licensing decision no later than two years after receipt of a completed application.

In November 2018, FERC invited federal and state agencies and Native American tribes to participate in an interagency task force (ITF) to coordinate the regulatory processes associated with the proposed expedited licensing process. The commission convened an ITF coordination session in December 2018 and issued a notice of proposed rulemaking in January 2019 seeking comment on the proposed expedited licensing process.

Under the final rule, an interested applicant must file a request for authorization along with its license application. To qualify as a facility at an existing non-powered dam for the purposes of the expedited licensing process, a facility cannot already be licensed or exempted from the licensing requirements in the Federal Power Act. The applicant also must demonstrate that the facility will be associated with a qualifying non-powered dam and will be constructed, operated and maintained for the generation of electric power. The facility must generate electricity by using withdrawals, diversions, releases or flows from the associated qualifying non-powered dam, and its operations must not make any material changes to the storage, release or flow operations of the associated qualifying non-powered dam.
[Native Advertisement]

To qualify as a closed-loop pumped storage project, the project must cause little or no change in existing surface and groundwater flows and uses and must be considered unlikely to adversely affect threatened or endangered species or their designated critical habitat under the Endangered Species Act. The final rule also adds qualifying criteria to ensure that a qualifying pumped storage project uses only reservoirs situated at locations other than natural waterways, lakes, wetlands and other natural surface water features and relies only on temporary withdrawals from surface waters or groundwater for the sole purposes of initial fill and periodic recharge needed for project operation.

The application also must include consultation documentation with stakeholders, including federal and state agencies, tribes and dam owners.

FERC said April 18 that the final rule will take effect 90 days after publication in the Federal Register.

Source

Related posts

Denver vehicle-to-building pilot yields net benefits

Denver vehicle-to-building pilot yields net benefits

10th December 2021
India’s wind market is ready for its comeback

Building out renewables in India could cost $26.5b through 2030, report says

10th December 2021
Previous Post

Insulate and Soundproof an Interior Wall or Room with Roxul

Next Post

‘Do everything in your power to tackle climate change’ UN chief urges on Mother Earth Day

Next Post
‘Do everything in your power to tackle climate change’ UN chief urges on Mother Earth Day

‘Do everything in your power to tackle climate change’ UN chief urges on Mother Earth Day

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED NEWS

The Perfect Storm Fueling Pakistan’s Solar Boom

5 days ago

Bottom-Up Experiences in Recife and Teresina Underpin Brazil’s New National Policy on Urban Peripheries

2 days ago

5 Key Levers Countries Can Use to Advance a Just Transition

2 hours ago

POPULAR NEWS

  • Forming joint ventures to construct US offshore wind farms

    Forming joint ventures to construct US offshore wind farms

    0 shares
    Share 0 Tweet 0
  • Tuesday’s Daily Brief: Bicycles for the environment, new leader for the UN General Assembly, UN values, Ebola, Syria and Libya

    0 shares
    Share 0 Tweet 0
  • Anthrax outbreak compounds security crisis in eastern DR Congo

    0 shares
    Share 0 Tweet 0
  • Ultra-fast EV chargers coming ultra soon as e-mobility manufacturers ramp up

    0 shares
    Share 0 Tweet 0
  • Woman army officer in forefront of COVID-19 battle in Sierra Leone |

    0 shares
    Share 0 Tweet 0
Ecobuild.club

ecobuild.club is an online news portal which aims to provide knowledge about Sustainability, Insulation, Energy Efficiency, Eco Build, Green Energy & Natural Global Resources.

Follow us on social media:

Recent News

  • 5 Key Levers Countries Can Use to Advance a Just Transition
  • Bottom-Up Experiences in Recife and Teresina Underpin Brazil’s New National Policy on Urban Peripheries
  • The Perfect Storm Fueling Pakistan’s Solar Boom

Category

  • Eco Build
  • Energy Efficiency
  • Green Energy
  • Insulation
  • Natural Global Resources
  • Sustainability
  • Videos

Subscribe to get more!

  • About
  • Contact
  • Privacy Policy

© 2018 EcoBuild.club - All about Eco Friendly Environment !

No Result
View All Result
  • Home
  • Sustainability
  • Insulation
  • Energy Efficiency
  • Eco Build
  • Green Energy
  • Natural Global Resources
  • Videos

© 2018 EcoBuild.club - All about Eco Friendly Environment !