Thursday, May 21, 2026
  • About
  • Contact
  • Privacy Policy
Ecobuild.club
  • Home
  • Sustainability
  • Insulation
  • Energy Efficiency
  • Eco Build
  • Green Energy
  • Natural Global Resources
  • Videos
No Result
View All Result
Ecobuild.club
Home Energy Efficiency

Tower sections of GE’s 12-MW offshore wind turbine shipped to prototype site

11th June 2019
in Energy Efficiency
0
Tower sections of GE’s 12-MW offshore wind turbine shipped to prototype site
0
SHARES
17
VIEWS
Share on FacebookShare on Twitter

GE Renewable Energy announced the shipment of the four tower sections that will be part of GE’s Haliade-X 12 MW prototype to be installed later this summer in Maasvlakte-Rotterdam (NL). The four segments at tower manufacturer GRI’s site in Seville, will be arriving in the Netherlands before the end of the month.

Upon arrival in Rotterdam, a series of pre-assembly works will take place, including the installation of some  tower segments. After the nacelle and blade components arrive later in the summer, local teams will complete the prototype installation.

Related posts

Denver vehicle-to-building pilot yields net benefits

Denver vehicle-to-building pilot yields net benefits

10th December 2021
India’s wind market is ready for its comeback

Building out renewables in India could cost $26.5b through 2030, report says

10th December 2021

John Lavelle, President & CEO of Offshore Wind at GE Renewable Energy said “The shipping of tower sections is another important milestone in the development of our Haliade-X 12MW prototype in Maasvlakte-Rotterdam. Our teams in Cherbourg and Saint-Nazaire are rapidly progressing on Haliade-X assembly, and we are working to get the unit fully installed before the end of the summer.”

Haliade-X 12MW nacelle is currently being assembled in Saint-Nazaire (France), while its 107-meter long blades are being manufactured at LM Wind Power site in Cherbourg (France). Nacelle and blades will be shipped to Maasvlakte-Rotterdam and installed before the end of the summer. 

This prototype will be installed onshore to provide easier access for testing. During the initial period of operations, it will allow GE Renewable Energy to collect data needed to obtain a Type Certificate, a key step to go into serial production in 2021.

[Native Advertisement]

Haliade-X 12 MW is a multi-million investment that will help that will help reduce offshore wind’s cost of energy in order to make it a more competitive source of clean and renewable energy.

Haliade-X 12 MW in numbers

  • 12MW capacity
  • 220-meter rotor
  • 260 meters high
  • 107-meter long blades
  • 67GWh gross Annual Energy Production**
  • Will generates more energy than most powerful wind turbine available in the market today**
  • One Haliade-X 12 MW can generate enough clean power to supply 16,000 households**

 **Based on wind conditions on a typical German North Sea site.


POWERGEN Europe takes place November 12-14 in Paris, France. Learn about the event heretvcusytyswysddcduq. 

Source

Previous Post

RetroFoam - Spray Foam Insulation - Home Insulation

Next Post

DIY Waxed Fabric Wraps // Eco Craft

Next Post
DIY Waxed Fabric Wraps // Eco Craft

DIY Waxed Fabric Wraps // Eco Craft

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED NEWS

International Day for Biological Diversity (IDB) 2026

3 days ago

Nature-Based Solutions Help African Cities Fight Floods

3 days ago

Energy Leaders Tout the Benefits of Renewables

2 days ago

Press Release | Multistakeholder Advisory Group Renewed and MAG Chair Appointed to Prepare the XXI Internet Governance Forum Meeting in 2026

3 days ago

POPULAR NEWS

  • World News in Brief: Aid for Syria, children under attack in Mozambique, rights-based climate action

    0 shares
    Share 0 Tweet 0
  • Safety, reliability key when maintaining 97-year old hydropower assets

    0 shares
    Share 0 Tweet 0
  • Sudan launches first malaria vaccine in landmark child health initiative

    0 shares
    Share 0 Tweet 0
  • A city safe for women is safe for all: Women’s voices lead at World Urban Forum in Cairo

    0 shares
    Share 0 Tweet 0
  • Early warning systems critical as world marks Tsunami Awareness Day

    0 shares
    Share 0 Tweet 0
Ecobuild.club

ecobuild.club is an online news portal which aims to provide knowledge about Sustainability, Insulation, Energy Efficiency, Eco Build, Green Energy & Natural Global Resources.

Follow us on social media:

Recent News

  • Energy Leaders Tout the Benefits of Renewables
  • What is the ‘Like-for-Like’ Approach in Carbon Dioxide Removal?
  • Press Release | Developing economies bear the brunt of Middle East conflict as growth slows and inflation rises, UN warns

Category

  • Eco Build
  • Energy Efficiency
  • Green Energy
  • Insulation
  • Natural Global Resources
  • Sustainability
  • Videos

Subscribe to get more!

  • About
  • Contact
  • Privacy Policy

© 2018 EcoBuild.club - All about Eco Friendly Environment !

No Result
View All Result
  • Home
  • Sustainability
  • Insulation
  • Energy Efficiency
  • Eco Build
  • Green Energy
  • Natural Global Resources
  • Videos

© 2018 EcoBuild.club - All about Eco Friendly Environment !